Blog de construction

HMCS ASSINBOINE REFIT

Par Double Rum 2 participations 27 Juin 2023 — 28 Juin 2023
13Mentions J’aime
5Commentaires
Chapitre 01 / 02

Chapitres · 2 · faites défiler pour lire

Double Rum Message d’ouverture 1

HMCS ASSINBOINE REFIT

Beginning the process of refitting. Will be mostly a cleaning/painting project but will make some additional parts add to the ship. Today I cleaned the tail shafts and propellers/ hubs. The props are 2 inch Dumas props. Rather than use the usual drive dogs I machined flats to fit in the rear slot in the props . Looks much better the way this way in my opinion. I manufactured the cone nuts rather than use the out of scale nuts that are supplied with the props when you buy them. I made these shafts and nuts over thirty years ago.she had been in storage for all of that time.
Aimé par dave976 and chugalone100 and

Speed control/motors

Thirty years ago this was the speed control that I purchased, from Dumas boats. It’s a resister type that uses a lot of power and needs a servo to operate. I will not be using it. She has two twelve volt Dumas motors still in great shape . They just need to be cleaned up a little and oil the bronze bushings.
Aimé par Len1 and dave976 and

Delete this post?

Il sera retiré du site.

Abandonner ce brouillon ?

Votre brouillon sera supprimé et ne pourra pas être récupéré.

Vous avez un brouillon inachevé

Que souhaitez‑vous en faire ?