Blog de construction

Venice water Taxi just about complete.

Par IanL1 1 participation 4 Mai 2025
15Mentions J’aime
3Commentaires
Chapitre 01 / 01

Chapitres · 1 · faites défiler pour lire

IanL1 Message d’ouverture

Venice water Taxi just about complete.

Its been a while since I have updated you all on my Venice water taxi build. Over the last few months I have been working on the canopy and the hand rails, used to get on board. I am just about ready to give her her first sea trials in open water. The swimming pool here at the village I live in is not large enought to give her a good run, with out the fear of hitting the sides. It was really tricky machining the 0.75 mm pins for the canopy hinges but with a very sharp and pointed HSS tool it worked OK. Also I decided to glue the canopy top along the edges, where the frame goes through, as I dont have a machine to sew, so it all got very difficult. The end result was perfect as I used clear silicon sealant. The hand rail support flanges were turned from 5/16 dia brass with a 2 mm hole and soldered on the back face, which worked well. They are glued on with 5 minute araldite. My next update will cover the launch and hopefully a video of her steaming along. I am not sure if the notes for each photo is attached but if not I am sure you will all get the idea. Let me know if you have any questions. Cheers Ian
Aimé par alexandre and Ray and

Delete this post?

Il sera retiré du site.

Abandonner ce brouillon ?

Votre brouillon sera supprimé et ne pourra pas être récupéré.

Vous avez un brouillon inachevé

Que souhaitez‑vous en faire ?