Hi All
I have started my redesigned runabout by increasing the length to 860mm. The motor and ESC will move to under the removal dash for better weight balance. increase the engine hatch to get the Lipo battery, receiver and servo into. This will be hidden by the deck planking and the original hatch size will get it back to scale look. Brushless motor 3639-1100kv,3S battery, 60A car ESC and 37mm 3 blade prop.
Aimé par mtnmnstr and RNinMunich and

Stern Deck and bottom painting

Hi All
Dry fitted the stern deck and as it was a warm winters day spray undercoated the bottom and sides.
Canabus
Aimé par mtnmnstr and lhpen and

Deck Planking

Hi Guys
Well I installed the aft deck and started planking.
The outer trim planking is in two pieces with a joint behind the windscreen because my mate gave me the veneer for free.
The idea is to hide the joints with black waterproof sandpaper used for the nonslip pieces shown on the plan.

Canabus
Aimé par mtnmnstr and lhpen and

Deck Veener

Hi All
After sanding the deck, I vanished with two coats that was OK.
A bit of light sanding between coats and added another coat.
Check it the next day and a lot of section on the bow the veneer had lifted !!!
The stern section is OK.
It's the outer veneer and it's all one piece, used the same glue.
Very disappointed!!!!

Canabus
Aimé par Alan999

New deck planking

Hi All
Stripped off the old planking and started again with different wood glue.

Canabus
Aimé par mtnmnstr and Ronald and

More Planking

Hi All
Finished planking and added the first coat of vanish.

Canabus
Aimé par mtnmnstr and Brightwork and

Delete this post?

Il sera retiré du site.

Abandonner ce brouillon ?

Votre brouillon sera supprimé et ne pourra pas être récupéré.

Vous avez un brouillon inachevé

Que souhaitez‑vous en faire ?