rcmodelboats Message d’ouverture

PS Enterprise

This model is intended to be used to carry camera such as a go pro. my current camera vessel is a barge and I can't turn the barge without it looking bad on video so I wanted a vessel that can move under its own power but not too fast. The model is 1/20 and will have 2 paddles wheels, one on each side. This particular vessel is currently in Canberra NSW but it used to operate in Uchuka NSW.
Aimé par Joe727 and Colin H

PS Enterprise

The lip so it is as water light as possible is now made and the motor assembly will be made look like a boiler when fully completed.
Aimé par Colin H and RNinMunich and

boiler and struts

As this model will be Electric a mock boiler will be put in place for aesthetics as it can be seen clearly if you look directly front on, on the real ship. The struts that come out of the hull are for a extra piece of deck that then connects to the paddle boxes.
Aimé par Colin H and Joe727 and

PS Enterprise

The boiler is coming along nicely and the deck is glued down. The chain rudder servo is in place.
Aimé par Colin H and Joe727 and

PS Enterprise

The bow section of the top deck is made and is now Varnished, some pins as rivets on the bow, the Rudder shaft supports with pins as rivets and now the top deck stern section needs to.be made. The stern section has gaps in the wood.
Aimé par Inkoust and Colin H and

PS Enterprise

The Top deck is now complete. The hull is partially painted and the construction of the superstructure has begun and the rudder is now attached
Aimé par Inkoust and Colin H and

Superstructure frames and log box

The structural frame for the superstructure is now in place along with the 2 sides of the superstructure. The log box is being built and the little details are starting to go on.
Aimé par mturpin013 and MouldBuilder and

PS Enterprise paddle steamer update

The lower superstructure is basically done, the top deck is cut out, the lower section of the structure is painted and the paddle box faces are built. Next is the paddles and electrics
Aimé par jbkiwi and RonH and

Enterprise

The paddle wheel is printed with the second on the way, shaft gear is in place with the motor about to be installed. The rear deck sides are rounded and will be painted soon.
Aimé par MouldBuilder and jbkiwi and