#5449

barryskeates United Kingdom Basique

Matelot principal  · 82 pts newbury, Berkshire, United Kingdom Membre depuis Fév 2019 Dernière connexion il y a 6 ans
12 Messages 1 Abonnés
0 Bateaux au port
1 Blogs de construction
39 Mentions J’aime reçues

barryskeates’s journaux de construction

1 blog

Abonnés

1 abonné

Téléversements récents

Dernière activité

Dernière publication il y a 7 ans
Build blog updatequite a while since last updateit been quite a while since the last update, holidays, work, sun shine etc all got in the way we have done some amount of work on the model in past few months mostly around the running gear and some electrics …+61,360 viewsBuild blog updatePlanking the deckHad a few days off enjoying the sunshine so slowed down slightly so a short update today Sealed the deck, holes etc to protect from water ingress into the wood itself then Dad went ahead and planked the deck i…1,359 viewsBuild blog updateWheel Boxes and deck holesForgot an item on the last update, I fitted the pipes and ladder to the 2 funnels. This week:- My dad did a load more work on the wheel boxes, mainly adding the "steps" and portholes to the boxes. Cutting thin…+81,359 viewsBuild blog updateWheel BoxesDone a load of work around the wheel boxes this week (as well has finishing the other Deck hatch as the parts had arrived). Started with a blanking plate where we drew on the curve of the wheel box as well as …+41,359 viewsBuild blog commentRe: funnel mounts and deck hatcheshi, cheers, might well do that (not straight away) but will do that a tad later 👍👍👍👍👍1,359 viewsBuild blog updatefunnel mounts and deck hatchesFitted the "legs" to the wheel house so now at correct height when on the deck. Funnel mounts done (just need to finish the funnels, workout what holes to drill and then mount the funnels to the mounts) so we …+41,359 viewsBuild blog updateend of week report LOLgood week this week, i should of said that there are 2 of us working on this Tug, myself and my father. this means that we are splitting the work up and as he is retired he can spend some more time on the boat…1,358 viewsBuild blog updateDeck Partsgood weekend Made up, painted and planked up the engine cover and the 2 funnel stands. Funnel stands need to have the Cowl vents, funnels, hatches and tow mounts fitted to them. Need top make up, create, paint…1,358 viewsBuild blog updateDeck and FunnelsGoing for a removable deck (bold on so to speak) so most of deck cutout and generally marked up for Engine cover, wheel house platform as well as where the funnels will go. also dry fitted the Funnels to the m…1,358 viewsBuild blog updateHull painted and Paddle Wheels donethus far put the rudder on, painted the bottom part of the Hull red and put together the Paddle Wheels1,358 views

Delete this post?

Il sera retiré du site.

Abandonner ce brouillon ?

Votre brouillon sera supprimé et ne pourra pas être récupéré.

Vous avez un brouillon inachevé

Que souhaitez‑vous en faire ?